PROJECT SUMMARY
The TriTown Landing development is 131 units in four and three-story buildings. Completed in phases, the wood-framed structures have vinyl siding and asphalt shingle roofing. Each building has elevators, laundry rooms on each floor, a management office, exercise room, community room, intercom system and security card access.
The one, two and three bedroom affordable living units each have a full kitchen with appliances, a private deck and a utility closet housing individual air conditioning, heating and water systems.
Site work on the 8.7 acre site included parking lots, a playground and tie-ins to the City of Lunenburg sewer and water systems. Wall framing was prefabricated off-site concurrent with foundations allowing for a shortened schedule and winter conditions.
Phase 4, the newly completed Baker Brook Apartments, is 74,500 square foot facility with 70 senior housing units.
![Baker Brook Senior Residences Baker Brook Senior Residences, Lunenburg, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/et_20210706_bakerstreet-8268.jpg?resize=1080%2C720&ssl=1)
![Baker Brook Senior Residences Baker Brook Senior Residences, Lunenburg, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/et_20210706_bakerstreet-8224.jpg?resize=1080%2C720&ssl=1)
![Baker Brook Senior Residences Baker Brook Senior Residences, Lunenburg, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/et_20210706_bakerstreet-8203.jpg?resize=1080%2C720&ssl=1)
![Baker Brook Senior Residences Baker Brook Senior Residences, Lunenburg, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/et_20210706_bakerstreet-8156.jpg?resize=1080%2C720&ssl=1)
![Tri-Town Landing, Leominster, MA Baker Brook Senior Residences, Lunenburg, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/Edited.jpg?resize=1080%2C810&ssl=1)