Cheshire Medical Center
Keene, NH
PROJECT SUMMARY
The MRI addition was a two-story addition to the Radiology Department for a new MRI. It is a steel frame structure with CMU backup and brick veneer. The project included a complete RF shielded scan room with a machine room and a new dedicated chiller.
The PACU project was the complete renovation of the existing Post Anesthesia Care Unit. It was completed while the PACU remained in full operation separated by temporary partitions.
The Kingsbury Cancer Care Center project involved 8,000 square feet of additions and renovations. It was a steel frame, CMU backup, brick veneer addition. It included a new mechanical penthouse on the existing hospital for service to new and existing areas along with renovation on the second level over the operational Radiation Oncology Department.