Dublin School Fountain Arts Building
Dublin, NH
![Fountain Arts Building Dublin School, Fountain Arts Building, Dublin, NH](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/03/IMG_1887.jpg?resize=1080%2C720&ssl=1)
PROJECT SUMMARY
This project involved the renovation and addition to the School’s original one story performing arts building. The structure was demolished to the top of the basement walls and a new structure was added.
The main floor includes an auditorium, entry, bathrooms and storage space. The basement was renovated to include four classrooms, two bathrooms and a costume/dressing area. A new elevator as installed as well as an exterior concrete stage.
![Fountain Arts Building Dublin School, Fountain Arts Building, Dublin, NH](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/03/IMG_1907.jpg?resize=1080%2C720&ssl=1)
![Fountain Arts Building Dublin School, Fountain Arts Building, Dublin, NH](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/03/IMG_1814.jpg?resize=1080%2C720&ssl=1)
![Fountain Arts Center, Dublin School, Dublin, NH Fountain Arts Center, Dublin School, Dublin, NH](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/IMG_1837.jpg?resize=1080%2C720&ssl=1)