PROJECT SUMMARY
This project included the demolition of the existing fire station—built in 1954 and could no longer fit more modern fire trucks—and the construction of the new state-of-the-art Pinehurst Branch Facility at the same location.
Two bays accommodate fire trucks and a mechanics bay with rotary lifts and enough space for a ladder truck. A backup dispatch center for emergency use, a triage room for medical calls, and facilities for gear cleaning and storage.
The living quarters include a fitness room, a rooftop deck with grills and planter boxes for gardening, ventilated lockers, laundry, lounge and full kitchen. The space is designed with training props including a trench in the garage, a false manhole, a window with removable glass, and anchors for rope training.
![Pinehurst Fire Station Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220201_billerica_0364.jpg?resize=1080%2C720&ssl=1)
![Pinehurst Fire Station Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220201_billerica_0400.jpg?resize=1080%2C720&ssl=1)
![Pinehurst Fire Station, Billerica, MA Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220201_billerica_0415.jpg?resize=1080%2C720&ssl=1)
![Pinehurst Fire Station, Billerica, MA Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220319_pinehurstribboncutting_0718_web.jpg?resize=1080%2C720&ssl=1)
![Pinehurst Fire Station Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220201_billerica_0438.jpg?resize=1080%2C720&ssl=1)
![Pinehurst Fire Station Pinehurst Fire Station, Billerica, MA](https://i0.wp.com/hutterconstruction.com/wp-content/uploads/2024/04/20220319_pinehurstribboncutting_0698_web.jpg?resize=1080%2C720&ssl=1)